NSW Trains Wiki
Advertisement
SRA

The State Rail Authority, a former statutory authority of the Government of New South Wales, was responsible for the operation and maintenance of railways in NSW from July 1980 until December 2003.

History[]

The State Rail Authority was established pursuant to the Transport Authorities Act 1980 that separated the functions of the Public Transport Commission with the State Rail Authority taking responsibility for trains, and the Urban Transit Authority responsibility for buses and ferries.[1] In July 1982 a new colour scheme developed by Phil Belbin of red, yellow, orange and white was unveiled. This was commonly referred to as the candy colours. The L7 logo used by the Public Transport Commission was retained, albeit with the dark and light blue replaced with red and orange.

Electrification[]

During its tenure the State Rail Authority completed a number of electrification projects:

  • Gosford - Wyong: April 1982[2]
  • Wyong - Newcastle: June 1984
  • Waterfall - Port Kembla: February 1986
  • Riverstone - Richmond: August 1991
  • Coniston - Dapto January 1993

Rolling Stock[]

The State Rail Authority introduced new Class 80, Class 81 and Class 86 locomotives, K set, C set, Tangara, Millenium and V set double deck electric trains and the XPT. It also placed an order for the Class 82 and Class 90 locomotives that were delivered to FreightRail in 1994. A fleet of Denning and Scania coaches was purchased to replace withdrawn country rail services.

Booz Allen Hamilton review and restructure[]

Following the election of the Greiner State Government in March 1988, consultants Booz Allen Hamilton were commissioned to prepare a report into NSW rail services. In November 1988, before the report was complete, the North Coast Overnight Express to Grafton, the Northern Mail to Moree and Tenterfield, the Bathurst day train, the Western Mail to Dubbo and the Canberra Monaro Express to Cooma all ceased.

After receiving the Booz Allen Hamilton report, the government released its response in July 1989 under the title CountryLink 2000. It was announced the number of staff employed on country rail operations would fall from 18,000 to 10,000, including the withdrawal of staff from 94 country railway stations and the Nyngan - Bourke, Queanbeyan - Cooma and Glen Innes - Wallangarra lines would close.

Several country passenger services ceased over the next few years including the Silver City Comet, Northern Tablelands Express, Canberra XPT, Brisbane Limited, Gold Coast Motorail, South Coast Daylight Express, Intercapital Daylight and Sydney/Melbourne Express These were replaced either by XPT sets, EMU/DMU sets or coaches. Coach services which had been operated by the State Rail Authority's own fleet were be contracted out to private operators. The report had recommended closing all country passenger services as they were judged unviable, however this was not politically acceptable.

The State Rail Authority was divided into business units:

  • CityRail: responsible for suburban and interurban passenger services
  • CountryLink: responsible for country passenger services
  • FreightRail: responsible for freight services
  • Rail Estate: responsible for rail property

CityRail adopted a blue and yellow colour scheme including L7 logo, CountryLink a blue, white and grey scheme and FreightRail a blue and yellow scheme.

July 1996 restructure[]

In July 1996 the State Rail Authority was restructured into four distinct entities by the Transport Administration Amendment (Rail Corporatisation and Restructuring) Act 1996[3][4] to separate infrastructure from operations as required by the Competition Policy Reform Act 1995.[5][6] This was part of the process of moving to an open access regime.

The entities were:

  • Freight Rail Corporation: responsible for freight services
  • Rail Access Corporation: responsible for managing track and providing access to public and private operators
  • Railway Services Authority: responsible for track and rolling stock maintenance
  • State Rail Authority: passenger service operator consisting of CityRail and CountryLink

February 1998 restructure[]

Another restructure in February 1998 saw the State Rail Authority split into four operating divisions:[7]

  • CityRail Stations
  • CountryLink
  • Operations
  • Passenger Fleet Maintenance

January 2001 restructure[]

In January 2001 the Rail Access Corporation and Railway Services Authority were merged into the Rail Infrastructure Corporation that took responsibility for ownership and maintenance of the infrastructure.[8][9]

January 2004 restructure and wind down[]

In January 2004, after much criticism and public perceptions of blame shifting between units for operational failings, RailCorp was formed taking over the passenger train operations from the residual State Rail Authority (CityRail and CountryLink) and responsibility for maintaining the greater metropolitan network from the Rail Infrastructure Corporation.[10][11] By June 2006 much of the operational function had been transferred with the State Rail Authority in the process of being wound down.

Annual Report 30 June 2006

See also[]

Advertisement